Construction of a 123 foot long two span bridge using accelerated bridge construction methods. The project scope also included roadway widening, asphalt paving and guardrail.
- Project:
- Owner:
- Prime Contractor:
- Contract Amount:
- M-22-Z Bridge Replacement
- Colorado Dept. of Transportation
- TLM Constructors, Inc.
- $2,585,546.00